Run Info

 AliceExperiment

 

RUN 2 DATA TAKING

Shift instructions:
  SPD on-call shift instructions

SPD detailed description:
  SPD operations manual

SPD private logbook:
  configuration changes
  hardware interventions

SPD JIRA Project
  https://alice.its.cern.ch/jira/issues/?filter=11426

SPD Offline Monitoring Code Repository
  https://gitlab.cern.ch/dcolella/SPD_Offline

Data taking per year:
  google-spreadsheets

Power system components inventory:
  google-spreadsheets

Routers inventory:
  google-spreadsheets

 

 

RUN 1 DATA TAKING

Shift instructions:
  SHIFT INSTRUCTIONS and ON-CALL INSTRUCTIONS

SPD configuration:
  status of the half-staves (2008-2009): Current Detector Status  
  voltages/currents/temperatures (August 2012): Condition parameters  
  status of the half-staves active chips in the PIT (June 2009 to May 2010): 2009-2010

Data taking per year:
  Dec 2007 - Feb 2008:  Run Summaries 
  2008 (April to August): List_of_Runs 
  2009: Useful runs 2009
  2010: 2010 runs  

 

 

USEFUL LINKS

List of phone numbers of the experts
Run coordinator page  Link
ALICE Electronic LogBook with online information from the ALICE Control Room
Table with the PCs for the SPD network at P2